Measured Building & Land Surveyors Gloucestershire Herefordshire Worcestershire

Flood Risk Assessments

Whether your planning application is for a small scale residential extension or a major commercial or industrial development, be it change of use or a construction project.

Gloucestershire Floods 2007

Gloucestershire Floods 2007

A Flood Risk Assessment is required as part of any planning application if your site is over one hectare in size in Flood Zone 1 and for all proposals for new developments located in Flood Zones 2 and 3. Alterations and small scale extensions are generally outside the scope of these policies, provided they are unlikely to have a significant effect on the storage capacity of the functional flood plain or affect local flooding problems.

Monument have close links with consulting engineers who specialise in water, drainage and flood risk assessments. We offer a service to produce professional topographical surveys to form the basis of these reports.